oil tanker ,fuel tanker,fuel truck
1 As an appointed special truck manufacturer by the Development and Reform committee of china authority, we are one of the leading manufactures producing oil tanker in china 2 We are also qualified to customize oil tanker according to your market 3 We can provide a competitive price due to the low material and labour cost. 4 We promise that all the oil tanker that are adapted and sold by us can get after-sale warranty service .
5 detailed information is below ,if you need more details ,please call me without any hesitate. my mobile phone is 0086-13507160150
Item | unit | parameter | ||
Vehicle model |
| CLW5102GYY Fuel Tanker | ||
Chassis model |
| EQ1108G6DJ16 | ||
Overall dimensions | mm | 7250×2470×2800 | ||
| Fact cubage | L | 12000 | |
GVW | kg | Appro×10800 | ||
Rated loading capacity | Appro×4980 | |||
Mass in working order | Appro×5625 | |||
Body internal dimensions | mm | 4500×1950×1130 | ||
Wheel base | 3950 | |||
F/R track base | 1900/1800 | |||
Approach/departure angle | ° | 30/18 | ||
Exhaust/hp | ml/kw | 5880/118 | ||
Max speed | km/h | 90 | ||
Tire specification | 9.00-20,9.00R20 | Engine type | EQB180-20 | |
Traction system | 4×2 | transmission | 6-speed with over drive | |
Number of axles | 2 | Electric system | 24v | |
Operation control system | Electrically hydraulic control | Allowable passengers in cab | 3 | |
Engine | DongFeng Cummins Environmental Protection,supercharge,diesel engine | |||
Production cycle | 7-10days | |||
Warranty | 12 month,from the date of supply | |||
Optional equipment description | 1 can be equipped with refueling pump , flow meter, tanker aircraft, refueling reel 2 can be separated into several small unattached tanks | |||
Special function description | 1can load different oils , chemicals ,and food separately 2can be designed to pump in –out and downgrade flow measured by flow meter or not! | |||
Tank features description | 1Tank is made of carbon steel .the whole tank can be separated into several unattached parts . diaphragm is welded in the middle of tank to reduce the pressure during the transportation .
2Antirust paint is pained and container indicator is installed to show the capacity of the tank during the pump in or out
3In order to ensure the tank pressure and atmospheric pressure are basically the same during their working , breathing valve is installed in the covered pot CUHK .when the tank pressure is higher than the outside pressure 8KPa , the front breathing valve would open ; when the tank pressure is lower than the outside pressure 3KPa , the real breathing valve would open |
12000 L 4*2 oil tanker,fuel tanker, fuel truck