GY-300T drilling rig Technical Specifications
Drilling Depth | 350m 280m 220m 120m | ||
Drilling hole diameter | 93mm 150mm 200mm 300mm | ||
Swivel Head | 0o90o | ||
Spindle Speed (r/min) | Forward | 49 86 136 187 234 406 640 885 | |
Reverse | 38 183 | ||
Maximum Torque | 3000N*m | ||
Spindle Stroke | 600mm | ||
Maximum Cylinder lifting force | 60KN | ||
Maximum Cylinder driving force | 45KN | ||
Spindle Through-hole |
| ||
Hoist | |||
Bobbin Diameter | 200mm | ||
Rope Diameter | 14mm | ||
Rope Capacity(7 floor) | 45m | ||
Lifting Capacity(single pipe) | 30KN | ||
Bobbin line speed (the third layer) | 0.48 0.84 1.33 1.84 m/s | ||
Mobile Oil Cylinder Stroke | 460mm | ||
Distance of Step Aside The Hole | 260mm | ||
Oil Pump(Wheel oil pump) | |||
Type | CBS-E528/F310-TLZ | ||
Displacement | (25/10)mL/r | ||
Normal Rated Speed | 2500 r/min | ||
Normal Pressure | (16/20)MPa | ||
Max Pressure | (20/25)MPa | ||
Power | |||
| Diesel | Electric motor | |
Type | 395k2 | Y180L-4 | |
Rated Power | 20KW | 22KW | |
Rated Speed | 1500r/min | 1470r/min | |
Dimensions | 2300*900*1750mm | ||
Weight(power not included) | 1300kg |
GY-300T drill