Welcome to ECOL - Join Free - Sign In
ZJ20 drilling rig
ZJ20 drilling rig
Supplier Info
[China Supplier]
Contact Person : Ms. Guo Junlin
Tel : 86-0393-4751711
Fax : 86-0393-4752431
Product Detail
This drilling rig is mainly used for drilling service in 800m-4000m(4-1/2 DP) depth oil, water well and coal gas well.

This drilling  rig is mainly used for drilling service in 800m-4000m(4-1/2 DP) depth oil, water well and coal gas well.

(1) The design and manufacturing for the rig stick to this principle that is safe, reliable, advanced, convenient and economical. The whole performance conforms to HSE requirements and rule.

The technical performance and parameter of rig accord with the national and industrial standard which are GB 3826.1,GB3826.2,SY5609, main components conform to API Spec Q14F6A7K8A requirements.  The rig conforms to 3C standard.

(3) Adopts heavy duty carrier 8×810×812×814×8,which are made by ourselves. Hydraulic assist steering system is adopted, it has good cross country performance.

(4 )CAT diesel engine and Detroit diesel  are matched with ALLISON transmission box and TWIN DISC hydraulic transmission box, which can fulfill high effective transmission. Rotary table can adopt electrical drive. Emergency motor power system is optional.

(5) Main brake of main drum can adopt belt or disc brake, auxiliary brake can use air control and water cooling disc brake.

(6) Transmission system of Rotary table can realize Rotary tables forward and reversal rotation, which can satisfy DP screw rotary operation. Anti torque releasing device can ensure the torque is released before the DP distort.

(7) Derrick is hydraulic raising and lowering , front open and double section hydraulic telescoping.

(8) Substructure is double section telescoping or parallelogram structure. The height and floor area can be designed according to users requirements.

(9) Perfect solid control, well control, high pressure manifold system and generator house, air source house, doghouse and mud pump set, which can meet different requirements.

(10) Transmission system of rig, derrick, Drawworks and control system are centralized on the carrier, so the rig can be transported expediently and operated safely.

(11) The design of rig stick to this principle that is safe, reliable, advanced, convenient and economical.  Strengthen safe protection and test measure. The whole performance conforms to HSE requirements and rule.

Model

 

ZJ10

ZJ15

ZJ20

ZJ30

ZJ40

Carrier driving form

 

8×8

10×8

12×8

14×8

14×8

14×10

Engine power

BHP

350

475

600

2×525

2×525

Rated hook load

kN

600

800

1200

1500

1800

Max. hook load

kN

900

1100

1580

1800

2250

Max. fastline pull of main drum

kN

180

196

210

280

280

Max. fastline pull of sand drum

kN

105

105

105

105

105

Working height of mast

m

31.6

32

35

38

38

Monkey board(adjusted)

m

20.6

20.6

20.6

21.7

21.7

Substructure

Height of substructure

m

3.4

4

4.5 or 5

6

6

Substructure area (L×W)

m

4×6

5×7

5×7

5×7

5×7

Traveling system form

 

4×3

5×4

5×4

5×4

6×5

Normal drilling depth(4 1/2 DP)

m

1000

1500

2000

3000

4000

ZJ20 drilling rig

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.