Thermoplastic powder coating production line
One, Process
loading-spraying-solidification(180-200°C)-cooling-off loading workpiece
Second, Equipment disposition and explanation
1. Drying oven
1) Drying oven used mode of continuous work, the air gas heating, in the role of hot air circulating, coupled with rational design of the delivery, installation on the back wind, temperature furnace more balanced to ensure that products with color phenomenon.
2) Hot-air drying wind screen is installed in the furnace exports, and installing sliding doors and installation activities, reducing the heat loss.
2. Gas heating system
3. Spraying room
4. Speed control elevator with Frequency Inverter
5. Powder recovery system using pulse recycling
6. Electrostatic spraying system
7. Electrical control system
The entire system is relatively centralized control, electrical arranged regularly and specifications matching the appropriate fasteners. Trough bridge specifications to meet the requirements, arranged neatly.
Thermoplastic powder coating production line