Welcome to ECOL - Join Free - Sign In
Scaffolding Plank Parts
Scaffolding Plank Parts
Supplier Info
[China Supplier]
Contact Person : Ms. Qiao Grace
Tel : 86-315-8129889
Fax : 86-315-8157436
Product Detail
Productivity advantages Price advantages Geographical advantage, colse to tianjin port Own export and import right

steel plank can replace timber or bamboo plank, construction workers can walk on that.There are many different sizes and materials of the steel plank, we can make that products according to the customer's requirements

1.Facilitated passage by two hooks2.Works with all styles of modular system3. do not absorb water or chemicals

We can supply all kinds of galvanized steel plank with hole and without hole 

Name

Size

Unit Weight kg/piece

Quantity Pieces/40HQ

Steel Plank

210*45*1.2mm*4m

14.32

1600

Steel Plank

210*45*1.2mm*3m

10.74

2100

Steel Plank

210*45*1.2mm*2m

7.16

3200

Steel Plank

210*45*1.2mm*1m

3.59

6350

 

 

Steel Plank

240*45*1.2mm*4m

15.7

1440

Steel Plank

240*45*1.2mm*3m

11.85

1950

Steel Plank

240*45*1.2mm*2m

7.85

2875

Steel Plank

240*45*1.2mm*1m

3.93

5750

 

 

Steel Plank

250*50*1.2mm*4m

17.07

1260

Steel Plank

250*50*1.2mm*3m

12.81

1700

Steel Plank

250*50*1.2mm*2m

8.53

2520

Steel Plank

250*50*1.2mm*1m

4.76

5000

 High quality Steel Plank, Scaffolding plank 1. Material: Q235

2\Special style and size according to the request of customer 3. Surface: Painted, Galvanize, hot DIP galvanized 4. Feature: 1). Stamping Holes on surface antisliping and safe 2). Plank with hook on two sides 3). Plank without hook on two sides 6. Quantity ablity: 2000ton per month 7. Sample time: 7-10 days 8. Loading Port: tTIANJIN

9. Payment terms: T/T, L/C 10. Noted: OEM is provided

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.