| | Test Item | Outlet status | pressure (MPa) | time(s) | Technical Requirements(according to GB18145-2003) | Test Conclusion | Inlet | Open | 1.6±0.05 | 60±5 | No leakage | Qualified | 0.4±0.02 | Outlet | Close | 1.6±0.05 | 60±5 | No leakage | Qualified | 0.4±0.02 |
| | Cold /Hot water cycle test: |
Put cartridge into -20±2°C and 95±2°C environment in turn. Every 12 hours as a period, do three times cold and hot water test continually; after that, put cartridge into 80±5°C water and mild water in turn in every 40 seconds, do 450 cycles continually. No leakage after cold/hot water cycle testing. |
| | According to the EN817,GB18145-2003 standard test more than 70,000 cycles (hot water temperature: 65±2o,cold water temperature: ≤30o,pressure: 0.3±0.05Mpa); According to the ASME A112.18.1-2005 standard test more than 500,000 cycles (hot water temperature: 66±6o,cold water temperature: 10±6o,pressure: 0.3±0.05Mpa). Technical data(according to ASME A112.18.1-2005) as the following table. |
| |
|